Industrial construction projects
- 2005 RAVENT STAL Sp. z o.o. - pre-fabrication of pipe-profile steel girders
- 2004 STALKON Sp. z o.o. - fabrication of trolley structures
- 2004 INMET – HYDRO Sp. z o.o. - fabrication of the structure of elements of rotating platforms
- 2004 MARITIME HYDRAULICS A/S – fabrication of gantry crane rail path structures
- 2004 VOEST ALPINE STAHL GMBH – fabrication of the structure of a gangway platform
- 2003 KRUPP GMBH – fabrication of the beams of a painting workshop for AIRBUS
- 2003 POLPHARMA S.A. – assembly of the housing of a high-storage warehouse
- 2003 EUROPORT – unloader equipment housing
- 2003 TVP S.A. - the steel structure of the roof
- 2001–2002 ZAKŁADY BUDOWNICTWA MOSTOWEGO, Bridge Construction Section No. 4 in Grabowiec – fabrication of steel structures on a viaduct
- 2001 SARL S.A.V.M – assembly of the steel structure of a belt conveyor in Le Havre (France) (weight approximately 95 Mg)
- 2001 SKANSKA SVERIGE AB – auxiliary structures of the Arsta Bridge - total weight 355 Mg
- 2001 ZAKŁADY BUDOWNICTWA MOSTOWEGO, Bridge Construction Section No. 4 in Grabowiec – elements of the steel structure on the access overpass road to the cable-stayed bridge within Trasa Sucharskiego
- 2001 SOPOCKI KLUB TENISOWY – renovation of spectator tribunes and courts
- 2001 ARMY UNIT in DĘBOGÓRZE – installation of top-mounted pouring units for the railway loading and unloading depot
- 2000–2001 CARREFOUR POLAND Sp. z o.o.- prefabrication and assembly of the steel structure of a retail supermarket hall and technical building
- 2000 SKANSKA SVERIGE AB – fabrication of flat sections of the steel structure of the Alle Bridge
- 2000 URZĄD GMINY MIELNIK (Mielnik Municipal Authority) – delivery and assembly of the steel structure of an amphitheatre
- 2000 FAMAK S.A. – assembly and tests of ship loading equipment
- 2000 MG ŻURAW S.A. – delivery and assembly of the housing for welfare and office facilities
- 2000 PROKOM INVESTMENTS S.A. – fabrication and assembly of the steel structure of a viewing deck
- 2000 GENERALNA DYREKCJA DRÓG PUBLICZNYCH (General Directorate of Public Roads) North Branch – construction of a steel pedestrian and road bridge across the Radunia in Pruszcz Gdański (the A1 national road)
- 2000 SKANSKA SVERIGE AB - fabrication of flat masking sections of the Alle Bridge
- 2000 WOJEWÓDZKIE PRZEDSIĘBIORSTWO ROBÓT DROGOWYCH „GRAVEL” Sp. z o.o. - prefabrication, assembly and anti-corrosion protection of the steel structure of the viaduct in ul. Hucisko in Gdańsk
- 2000 STÁLVERKTAK hf. Mỳrargata 2, Reykjavik – manufacture of two tank units, including instrumentation (V=170m3 and V=50m3)
- 2000 The Roman-Catholic Parish Church of Our Lady of Perpetual Help – disassembly of the roof and two walls of the church
- 2000 BAŁTYCKA BAZA MASOWA Sp. z o.o. – repair of the technological installation of a liquid fertilizer terminal
- 2000 SKANSKA SVERIGE AB – fabrication and assembly of a railway bridge and repair of a damaged bridge with the delivery of elements (Kosovo, Yugoslavia)
- 1999 PŁOCKIE PRZEDSIĘBIORSTWO ROBÓT MOSTOWYCH, Tczew Branch – delivery and assembly of the steel structure of a pedestrian footbridge over the A1 road (Gniew)
- 1999 POLPHARMA STAROGARD GDAŃSKI – installation of three ventilator fans
- 1999 POLLYTAG S.A.GDAŃSK – repair and upgrade of a bucket conveyor system
Did you know...
In 1973-1977 we took part in the construction of the Gdańsk Refinery, and we delivered all the works related to the mechanical and structural aspects of the project and to the assembly of technological pipelines?
Company in numbers...
From the moment we started our operations as an independent business entity, the total weight of steel structures delivered by MOSTOSTAL POMORZE S.A. for offshore projects has exceeded 25,000 metric tons.