Petrochemical and oil-refining industry
Fuel tanks
- 2008 –2009 GRUPA LOTOS S.A. – construction of fuel tanks (tank capacity: V=32,000 m3)





- 2007 GRUPA LOTOS S.A. - upgrade of the 2000 S-61 tank (capacity: V=5,000 m3)
- 2006 GRUPA LOTOS S.A. - general overhaul of the 1800-S3 tank (capacity: V=50,000 m3)
- 2004 GRUPA LOTOS S.A. - general overhaul of the 1900-S3 tank (capacity: V=2,000 m3)
- 2004 GRUPA LOTOS S.A. - re-construction of the 2080-S124 tank (capacity: V=2,000 m3)
- 2004 GRUPA LOTOS S.A. - repair of the 1800-S8 tank (capacity: V=50,000 m3)
- 2003 GRUPA LOTOS S.A.- repair of the 1800-S2 tank (capacity: V=32,000 m3)
- 2003 GRUPA LOTOS S.A.- general overhaul of the 2000-S54 tank (capacity: V=5,000 m3)
- 2003 RAFINERIA GDAŃSKA - repair of the 1800-S1 tank (capacity V=32,000 m3)
- 2002–2003 PERN „PRZYJAŹŃ” S.A. - repair of Tank No. 10 (capacity: V=50,000 m3)
- 2001–2002 GOMELTRANSNEFT “DRUZHBA” – fabrication of two dual-shell floating-roof tanks (capacity: V=75,000 m3) (Gomel, Belarus)
- 2001 NAFTOBAZY Sp. z o.o. – road and infrastructure repair, upgrade of tanks with capacity of V=5,000 m3 and V=10,000 m3
- 2000 GDAŃSKA S.A. – general overhaul of two tanks: 2000 S62 (V=20,000 m3) and 2000 S53 (V=5,000 m3)
- 2000 PERN „PRZYJAŹŃ” S.A. – tank upgrade: Tank No. 17 (V=32,000 m3) and Tank No. 18 (V=32000 m3)
- 2000 PERN „PRZYJAŹŃ” S.A. – periodical inspection and upgrade of Tank No. 1 (V=50,000 m3)
- 1999–2000 PERN „PRZYJAŹŃ” S.A. – disassembly of four tanks (Tank Nos. 1, 2, 3, 5, with the capacity of V=50,000 m3 each
- 1999 PERN „PRZYJAŹŃ” S.A. - upgrade of Tank No. 11 (V=32,000 m3) and Tank No. 12 (V=32,000 m3)
- 1998–1999 PERN „PRZYJAŹŃ” S.A. - upgrade of Tank No. 3 (V=32,000 m3) and Tank No. 8 (V=32,000 m3), inspection and upgrade of Tank No. 2 (V=50,000 m3)
Oil refinery systems
- 2008–2009 KTI POLAND S.A. – construction of a new sulphur recovery system (SRU/TGT)


- 2007 GRUPA LOTOS S.A. - shutdown repair of process systems: “Spring 2007”
- 2004–2005 GRUPA LOTOS S.A. - shutdown repair of process systems: “Spring 2005” (Units: PZH, PZO, Instalacja 900, and PZE)
- 2004–2005 GRUPA LOTOS S.A. - Upgrade of the system of Instalacja 900
- 2004 PETROBALTIC S.A. – making a connector–30”pipe-joint (VETCO GRAY method)
- 2004 GRUPA LOTOS S.A. - a process system to feed the Road Tanker Terminal
- 2004–2005 GRUPA LOTOS S.A. - delivery and assembly of Furnace No. 900F2


- 2003 GRUPA LOTOS S.A. – shutdown repair of Hydrocracking Plant systems (PZH I and PZH II)
- 2003 GRUPA LOTOS S.A. – repair of a road tanker loading station
- 2003 GRUPA LOTOS S.A. – replacement of tank piping systems –12” and 14” pipelines
- 2002–2003 RAFINERIA GDAŃSKA S.A. - prefabrication and assembly of decoking on Furnace No. 100F1
- 2002–2003 RAFINERIA GDAŃSKA S.A. - prefabrication and assembly of hydrogen gas pipelines, compressor piping and the structure of the compressor shed
- 2002 RAFINERIA GDAŃSKA S.A. – disassembly of Furnace 100 F1
- 2002 RAFINERIA GDAŃSKA S.A. - shutdown repair “Spring 2002”
- 2002 NAFTOBAZY Sp. z o.o. – upgrade and air-tight sealing of the depot – Phase II
- 2001–2002 TECHNIP- KTI – delivery and assembly of Furnace F1100 with instrumentation and piping systems
- 2001–2002 RAFINERIA GDAŃSKA S.A. – delivery and replacement of main flue ducts
- 2001 RAFINERIA GDAŃSKA S.A. - repair of plant, apparatus and pipelines at the Hydrocracking Unit
- 2001 NAFTOBAZY Sp. z o.o. – upgrade of the railroad loading (pouring) station and of water supply and sewage discharge systems
- 2001 RAFINERIA GDAŃSKA S.A. - shutdown repair of the hydrocracking plant
- 2000 RAFINERIA GDAŃSKA S.A. – mechanical engineering and upgrade works at the Hydrocracking Plant
- 2000 RAFINERIA GDAŃSKA S.A. – disassembly of Column No. 900C4 and delivery of a gas desulphuring system for a vacuum still
- 2000 NAFTOBAZY Sp. z o.o. – upgrade and delivery of new systems for No. 10 Fuel Depot in Kawice
- 1999–2000 RAFINERIA GDAŃSKA S.A. – start-up works on the hydrocracking plant
- 1999 RAFINERIA GDAŃSKA S.A. – replacement of high-pressure steam pipelines in the EC Unit
- 1999 ARMY UNIT MARCINKOWO – testing the tightness of the bottom of a fuel tank using the vacuometric method
- 1999 RAFINERIA GDAŃSKA S.A. – repair of the Oil Block Plant (“Spring 1999”)
- 1999 RAFINERIA GDAŃSKA S.A. – disassembly of the steel structure of a flare, pipelines, overpass structure, and the foundations of the 3500 plant
- 1998–1999 RAFINERIA GDAŃSKA S.A. – assembly of the Hydrocracking Plant
- 1998–1999 RAFINERIA GDAŃSKA S.A. – delivery and assembly of a steel chimney structure
- 1999 RAFINERIA GDAŃSKA S.A. – disassembly of a steel chimney
Did you know...
MOSTOSTAL POMORZE S.A. was recognized as the best Polish subcontractor on the H6e ALFA and BETA SEMI DRILLING RIG project delivered in 2006-2007 for AKER KVAERNER?
Company in numbers...
In the period 2004 – 2007, MOSTOSTAL POMORZE S.A. manufactured 96 complete structure sets of RTG (rubber-tyred gantry) cranes (shipped in 37 deliveries) for KALMAR INDUSTRIES OY Ab (Finland).