Shipbuilding and offshore industry

Tytuł

Oil platforms

  • 2007–2009 AKER KVAERNER STORD AS – fabricating the structure of the Gjøa Semi EPCH drilling platform

Gjoa Semi EPCHGjoa Semi EPCHGjoa Semi EPCH
Gjoa Semi EPCHGjoa Semi EPCHGjoa Semi EPCH

  • 2007 AIBEL AS - fabricating the structure of the Sleipner B platform compression module

SLEIPNER B COMPRESSION MODULESLEIPNER B COMPRESSION MODULESLEIPNER B COMPRESSION MODULE

  • 2007 AKER KVAERNER STORD AS - fabricating a temporary structure for section rising for the H6e Semi Drilling Rig project
  • 2007 MOSTOSTAL CHOJNICE S.A. - fabricating the structure of the Sevan 650 drilling unit
  • 2006–2007 AKER KVAERNER STORD AS - fabricating structures for the Alfa and Beta drilling platforms under the H6e Semi Drilling Rig project

H6e Semi Drilling RigH6e Semi Drilling RigH6e Semi Drilling Rig
H6e Semi Drilling RigH6e Semi Drilling RigH6e Semi Drilling Rig
H6e Semi Drilling RigH6e Semi Drilling RigH6e Semi Drilling Rig

  • 2005 VETCO AIBEL A/S – fabricating the HULDRA HALEPRODUKSJON compressor module

HULDRA HALEPRODUKSJONHULDRA HALEPRODUKSJONHULDRA HALEPRODUKSJON

  • 2004 OFFSHORE SYSTEMS A/S fabricating structure elements for the Langeled SLR Tie-in project

Langeled SLR TieinLangeled SLR TieinLangeled SLR Tiein

  • 2003 LEIRVIK MT TECHNOLOGY - fabricating an accommodation module for the DIBI platform

DIBIDIBIDIBI

  • 2002–2003 PETROBALTIC Sp. z o.o. – fabricating a subsea gas pipeline – 82 km
  • 2002–2003 PETROBALTIC Sp. z o.o. – fabricating a connecting section of a gas pipeline on the Baltic Beta platform between the subsea gas pipeline and the gas compression station.
  • 2001–2002 ABB OFFSHORE SYSTEMS A/S – assembly of section 340 of a platform (the KVITEBJØRN project)

Projekt KVITEBJØRNProjekt KVITEBJØRNProjekt KVITEBJØRN

  • 2001–2002 ABB OFFSHORE SYSTEMS A/S – prefabrication of pipelines for a section of the KVITEBJØRN project
  • 2001 PETROBALTIC Sp. z o.o. – modification of the CTP 3,5” pipeline
  • 2001 PETROBALTIC Sp. z o.o. – technical design, prefabrication and assembly of a production manifold (Baltic Beta)
  • 2000 PETROBALTIC Sp. z o.o. – reconstructing a high-pressure flushing installation on a platform
  • 2000 PETROBALTIC Sp. z o.o. – fabricating a production manifold and a high-pressure manifold and their assembly on an unmanned wellhead platform in the sea
  • 2000 PETROBALTIC Sp. z o.o. – fabricating a flange joint
  • 1999 PETROBALTIC Sp. z o.o. – assembly and welding of 30” pipe connector joints

Offshore wind farms

  • 2007 BLADT INDUSTRIES A/S - fabricating structural elements for the Robin Rigg project

Superstructures

  • 2005 CRIST Sp. z o.o. - fabricating sections 702 and 802 of the superstucture for the NB 380 vessel

2005 CRIST 12005 CRIST 12005 CRIST 1

  • 2004 CRIST Sp. z o.o. - fabricating the superstucture for the VS 4420 PSV vessel

VS 4420 PSVVS 4420 PSVVS 4420 PSV

Hulls

  • 2004 CRIST Sp. z o.o. – a section of the hull of the S668 Vessel

Decks

  • 2006 GDAŃSKA STOCZNIA REMONTOWA S.A. – prefabrication and assembly of sections for deck no. P5S for the Lucky Lady

LUCKY LADYLUCKY LADYLUCKY LADY

  • 2003 CRIST Sp. z o.o. – fabricating decks for the Lisblink
 